Crypto Briefing July 20, 2026

Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW

Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW

Hut 8 signed a $9.8 billion second lease at Beacon Point, doubling the Texas AI campus to 704MW and bringing total contracted capacity to 949MW worth

The post Hut 8 inks $9.8B lease for 352MW at Beacon Point, doubling campus capacity to 704MW appeared first on Crypto Briefing.

You might also like

Bitcoin shows near-zero correlation with rising b…
Sep 24, 2026 Read
Russia to raise taxes in 2027-29 for military spe…
Sep 24, 2026 Read
Over $100B wiped from crypto market in less than …
Sep 24, 2026 Read
US 10-year Treasury yield, Bitcoin declines amid …
Sep 24, 2026 Read